Skip to content
Free Next Working Day Delivery On Orders Over £100 ex VAT.
Trade customer? Call 0208 1919 223 for exclusive trade pricing and priority stock access.*
Official Partner

Moove 50" High Brightness 700 cd/m2 Commercial Monitor - Signage Display

SKU: SM50C1-L

Product description

  • Descriptions
  • Specifications
  • Warranty
  • Downloads
  • Moove 50" High Brightness Commercial Monitor - Signage Display (Suitable for shop-front window)

    Introducing our adaptable 24/7 commercial grade high brightness monitor with a simple digital signage media player. This versatile monitor can be used in landscape or portrait mode and is perfect for a wide range of commercial applications, from retail displays to corporate presentations.

    Commercial Monitors with its plug and play functionality, this monitor is incredibly easy to use. Simply plug it in, and you're ready to go. The included media player allows you to easily display your digital signage content, making it a great choice for businesses looking to enhance their messaging and branding.

    This commercial grade AV monitor is built to withstand 24/7 use, ensuring reliable and long-lasting performance. The monitor's high-quality display delivers exceptional clarity and detail, making it ideal for showcasing images, videos, and other digital content.

    Whether you need a display for a storefront window, a corporate boardroom, or any other commercial space, this adaptable monitor is the perfect choice. Its simple setup and plug and play functionality make it incredibly easy to use, while its robust construction and reliable performance ensure that it will provide you with years of reliable service. Choose this adaptable AV monitor for all your commercial display needs.

    50” 4K Commercial Display | 4K UHD - 700 cd/m2 Brightness
    Included Built-in Android OS
     Budget Friendly Digital Signage

    50" Commercial Monitor Features:
    Commercial grade VA Panel
    USB Plug and Play
    Portrait or Landscape Orientation
    Eco-Friendly Power Timer
    Temperature Control System
    Integrated Speakers
    24/7 Usage
    Multiple AV Inputs
    Wide Viewing Angle
    Ultra HD 4K 
    Three-Year Warranty

    NEW MOOVE SM Series Commercial Displays

    Presenting a 4K commercial display enhanced with non-glare technology and a conformal coating.
    Perfect for meeting rooms and as a welcoming message board in retail and hospitality settings.

    Display As You Desire

    Display As You Desire

    Whether horizontal or vertical way

    Our versatile display suits the unique needs of different stores. Showcase your content on a commercial-grade 4K UHD resolution screen and hone in on the essential functions you require.

    Setting Clone via USB Drive

    Setting Clone via USB Drive

    Clone Your file Via USB Drive. Easily duplicate the settings from one signage to another using a USB drive.

    Ultra Narrow Bezel

    Ultra Narrow Bezel

    The NG Series features an ultra-slim 9.9mm bezel, offering a more seamless viewing experience. Its sleek design makes it ideal for modern retail settings such as shopping malls, fast-food outlets, airports, and beyond.

    Retail or Hospitality

    Retail or Hospitality

    Upgrade your currently sign with Commercial LCD panel, high brightness, high saturation 4K display.

    Unlock More Functions with NG Series.

    Easy Manage, Auto Plug and Play.

    Wireless Screen Sharing

    Wireless Screen Sharing

    With our non-touch display's preinstalled ScreenShare Pro software, users can effortlessly mirror content from their external devices onto the display. It supports simultaneous sharing from up to 6 screens and is compatible with Windows, Mac, iOS, Android, Chromebook, Chromecast, and Airplay mirroring.

    Anti-Glare Display

    Anti-Glare Display

    Optimized for Business: Stable and Multifunctional Design
    With a non-glare coating, our display ensures clear visibility even under bright outdoor lighting. Additionally, the enhanced haze level boosts text readability, making it perfect for diverse business applications.

    Energy Saver Display

    Energy Saver Display

    Maximize Performance, Save Costs, and Protect the Environment
    With Energy-Star certification, our product not only offers peak performance but also ensures cost savings and environmental protection.

    3-year Warranty

    3-year Warranty

    3-year on-site swap-out warranty.
    We offer 3 year de-installation and re-installation warranty.

    Any warranty extension needs to be completed at point of order and should be clearly noted on the sales invoice.

    Covers hardware failure but excludes accidental damage or user error.

  • Feature Specification
    Screen Size 50''
    Backlight Type Slim DLED
    Native Resolution 3840 x 2160 (16:9) - UHD
    Dynamic Contrast Ratio 70000:1
    Response Time (typical) 8 ms
    Viewing Angle 178° Vert., 178° Hor. (89U/89D/89L/89R) @ CR>10
    Color Gamut 72% NTSC
    Refresh Rate 60 Hz
    Operation Hours 24/7
    Panel Technology IPS
    Brightness (typical) 700 cd/m²
    Contrast Ratio (typical) 5000:1 (typ.)
    Panel Life Time (Min.) 50000 Hrs
    Active Area (H x V) 1095.8 (H) x 616.4 (V) mm
    Color Value 1.07B
    Haze Level 3%
    Orientation Landscape / Portrait
    Area of Usage Indoor
    Mainboard Model 17MB400VS
    Memory 2 GB DDR4
    Additional Storage Micro SD (up to 1TB)
    GPU ARM Mali-G31 MP2
    WiFi WiFi 5 (802.11 a/b/g/n/ac), IEEE 802.1X Authentication
    HTML5 Browser Vewd
    Operating System Custom OS (built on Android AOSP)
    Storage 16 GB eMMC
    CPU Quad-Core ARM Cortex-A55
    Wired 10/100 Mbps Ethernet, IEEE 802.1X Authentication
    Bluetooth BT 5.1
    Wireless Display Miracast
    Video Input 4xHDMI2.0, 1xUSB-A 3.0, 1xUSB-A 2.0, 1xUSB-A 2.0 (Internal), 1x Micro USB
    Audio Input Headphone, Optic SPDIF
    External Sensor RJ12
    Video Output 1xHDMI2.0
    External Control RS232 (3.5mm jack green), Fast Ethernet (RJ45), Service (RJ12)
    Product Dimensions (WxDxH) 1121 x 63 x 646 mm
    Product Weight 12.8 kg
    Vesa Mounting 200 (W) x 200 (H) mm M6
    Package Dimensions (WxDxH) 1215 x 165 x 775 mm
    Package Weight 16.8 kg
    Bezel Width B: 13 mm, T/L/R: 9 mm
    Operating Temperature 0-40°C
    Operating Humidity 10-90%
    Power Supply 110 VAC - 240 VAC - 50/60 Hz
    Typical Power Consumption 121 W
    Deep Standby Power Consumption ≤0.5 W
  • Warranty

    3-year warranty.
    All standard product ranges come with a 3 year warranty starting from date of invoice. This excludes Electronic Shelf Label (ESL) products which come with a 2 year warranty. This also excludes all bespoke hardware which is manufactured under OEM.

    Any warranty extension needs to be completed at point of order and should be clearly noted on the sales invoice.

    Covers hardware failure but excludes accidental damage or user error.

    All screen sizes up to and including 55”, as well as media players, are covered by a swap-out warranty. There may be some situations (such as not having a particular model in stock) where an advanced replacement product cannot be supplied, in these cases a collection, repair and return service will be implemented. Screens larger than 55” and freestanding models (“L” and “OT” ranges only, excluding “LUHB”, “LHDS”, “TAO”, “AB” and “OAB” ranges) are covered by an on-site service.

    Free lifetime telephone and email technical support.
  • Description Downloads
    Datasheet Downloads

Technical Highlights

Display size / Screen sizes
50"
Resolution
Ultra HD (4K)
Panel type
IPS Panel
Screen type
Flat
Brightness
700 cd/m2
Response time
8ms
Screen ratio
16:9
Refresh rate
60Hz
Display orientation
Landscape & Portrait
Operating hours
24/7
Operating system
Android
Player features
USB Plug and Play
VESA patterns
400x400
Warranty
3 Year Warranty
See Before You Decide

Book a Free Product Demonstration

Compare picture quality, touchscreen performance, software and connectivity with guidance from a commercial display specialist.

Remote or on-site No obligation Expert-led session
For Integrators and Resellers

Open a Screen Moove Trade Account

Access project pricing, volume discounts, product sourcing support and faster commercial quotations for your client projects.

Trade pricing Project support Volume discounts
Apply for a Trade Account
Education & Public Sector

A simpler procurement route for schools and public organisations

Access education pricing, purchase-order support, installation services and account management for schools, academies, colleges, universities, NHS organisations, councils and government bodies.

Official Purchase Orders Accepted Verified education and public-sector organisations can order using official purchase orders with VAT-compliant invoicing.
Education and Project Pricing Request tailored pricing for classroom upgrades, multi-site deployments and larger equipment quantities.
Dedicated Account Support Receive one commercial contact for quotations, lead times, installations, product sourcing and rollout coordination.
30-Day Terms Subject to Approval Eligible institutions can apply for approved credit terms aligned with standard education and public-sector procurement.
Purchasing for a school, academy, university or NHS organisation? Register your organisation to request institutional pricing and purchase-order support.
Register Your Organisation
Trusted Store Status

Top Quality Store

Rating status, Exceptional, based on Google’s shopping experience metrics.
Exceptional

Why it matters

Demonstrates consistently strong fulfilment, service, and post-sale experience across Google signals.

Google
Top Quality Store
Built for confidence, next-day delivery options, UK-based support, trade-ready operations.
Request a quote

Get in touch

Speak directly with Screen Moove about your display, digital signage, meeting-room or AV project.

Need help choosing the right product?

Speak directly with a dedicated Screen Moove expert and get the right solution first time.

Contact us

Simply complete our contact form, and we will promptly respond to your inquiries.

If you have any questions or enquiry, please fill out the form below with all of your details and we'll get back to you shortly.

Ready to start your next AV project?

Contact our team of experts today!

Contact Us