Book a Free Product Demonstration
Compare picture quality, touchscreen performance, software and connectivity with guidance from a commercial display specialist.

Whether horizontal or vertical way
Our versatile display suits the unique needs of different stores. Showcase your content on a commercial-grade 4K UHD resolution screen and hone in on the essential functions you require.

Clone Your file Via USB Drive. Easily duplicate the settings from one signage to another using a USB drive.

The NG Series features an ultra-slim 9.9mm bezel, offering a more seamless viewing experience. Its sleek design makes it ideal for modern retail settings such as shopping malls, fast-food outlets, airports, and beyond.

Upgrade your currently sign with Commercial LCD panel, high brightness, high saturation 4K display.
Easy Manage, Auto Plug and Play.

With our non-touch display's preinstalled ScreenShare Pro software, users can effortlessly mirror content from their external devices onto the display. It supports simultaneous sharing from up to 6 screens and is compatible with Windows, Mac, iOS, Android, Chromebook, Chromecast, and Airplay mirroring.

Optimized for Business: Stable and Multifunctional Design
With a non-glare coating, our display ensures clear visibility even under bright outdoor lighting. Additionally, the enhanced haze level boosts text readability, making it perfect for diverse business applications.

Maximize Performance, Save Costs, and Protect the Environment
With Energy-Star certification, our product not only offers peak performance but also ensures cost savings and environmental protection.

3-year on-site swap-out warranty.
We offer 3 year de-installation and re-installation warranty.
Any warranty extension needs to be completed at point of order and should be clearly noted on the sales invoice.
Covers hardware failure but excludes accidental damage or user error.
| Feature | Specification |
|---|---|
| Screen Size | 65" |
| Backlight Type | Slim DLED |
| Native Resolution | 3840 x 2160 (16:9) - UHD |
| Dynamic Contrast Ratio | 70000:1 |
| Response Time (typical) | 8 ms |
| Viewing Angle | 178° Vert., 178° Hor. (89U/89D/89L/89R) @ CR>10 |
| Color Gamut | 72% NTSC |
| Refresh Rate | 60 Hz |
| Operation Hours | 24/7 |
| Panel Technology | IPS |
| Brightness (typical) | 700 cd/m2 |
| Contrast Ratio (typical) | 1200:1 (typ.) |
| Panel Life Time (Min.) | 50000 Hrs |
| Active Area (H x V) | 1428.5 (H) × 803.5 (V) mm |
| Color Value | 1.07G (8bits + FRC) |
| Haze Level | 1% |
| Orientation | Landscape / Portrait |
| Area of Usage | Indoor |
| Mainboard Model | 17MB400VS |
| Memory | 2 GB DDR4 |
| Additional Storage | Micro SD (up to 1TB) |
| GPU | ARM Mali-G31 MP2 |
| WiFi | WiFi 5 (802.11 a/b/g/n/ac), IEEE 802.1X Authentication |
| HTML5 Browser | Vewd |
| Operating System | Custom OS (built on Android AOSP) |
| Storage | 16 GB eMMC |
| CPU | Quad-Core ARM Cortex-A55 |
| Wired | 10/100 Mbps Ethernet, IEEE 802.1X Authentication |
| Bluetooth | BT 5.1 |
| Wireless Display | Miracast |
| Video Input | 4xHDMI2.0, 1xUSB-A 3.0, 1xUSB-A 2.0, 1xUSB-A 2.0 (Internal), 1x Micro USB |
| Audio Input | Headphone, Optic SPDIF |
| External Sensor | RJ12 |
| Video Output | 1xHDMI2.0 |
| External Control | RS232 (3.5mm jack green), Fast Ethernet (RJ45), Service (RJ12) |
| Product Dimensions (WxDxH) | 1456 x 74 x 834 mm |
| Product Weight | 24.7 kg |
| Vesa Mounting | 600 (W) x 400 (H) mm M6 |
| Package Dimensions (WxDxH) | 1650 x 190 x 997 mm |
| Package Weight | 34.75 kg |
| Bezel Width | B: 14 mm, T/L/R: 10 mm |
| Operating Temperature | 0-40°C |
| Operating Humidity | 10-90% |
| Power Supply | 110 VAC - 240 VAC - 50/60 Hz |
| Typical Power Consumption | 194 W |
| Deep Standby Power Consumption | ≤0.5 W |
| Description | Downloads |
|---|---|
| Datasheet | Downloads |
Compare picture quality, touchscreen performance, software and connectivity with guidance from a commercial display specialist.
Access project pricing, volume discounts, product sourcing support and faster commercial quotations for your client projects.
Access education pricing, purchase-order support, installation services and account management for schools, academies, colleges, universities, NHS organisations, councils and government bodies.
Demonstrates consistently strong fulfilment, service, and post-sale experience across Google signals.
Great products and service! The guys always go above and beyond to make sure they supply you with the product that best fits your needs. I’ve been using Screen Moove for a number of years now and woul...
See moreScreen Moove went above and beyond for my requirements. Ordering system was super easy it just take 2 minutes to complete my order and I have received my tracking details right away after few minutes...
See moreMoe Khan, one of the team at Screen Move has been a fantastic help as we have navigated the process of choosing and buying screens and stands for our church. Helpful at every step of the way, patient...
See moreWe originally planned to purchase a cheap TV for our showrooms. After speaking with screen moove, we ended up investing in floorstanding displays across multiple retail sites and showrooms. The bright...
See moreI placed my order late at night but realized I had entered the wrong address. I immediately sent an email asking for it to be changed, not really expecting a reply until the next day. To my surprise,...
See moreI’ve been looking ultra high brightness display despite I checked everywhere I didn’t trust. They got my trust and I ordered. It arrived safely next day we have installed screen is awesome and high qu...
See moreThis is second time I used Screen Moove, I have bought double sided 55 inch display. The first order was a bit delayed I don't blame it might be happen, but customer service over the phone was excell...
See moreScreenmoove, perfect customer satisfaction from start to finish! Their customer service is incredibly helpful and fast. It’s amazing to be able to reach out and get quick solutions for any issue. We a...
See moreWe found that we needed a video call to work out the set up. The tech team at screenmoove were very very good. I would suggest that the instructions that come with the screen offer two key info. 1. Set...
See moreGreat experience with Jonathan Gray, previously I was looking for other companies and randomly ordering our needs from elsewhere. after I met with him, since 2024 we are keep purchasing from screen m...
See moreSpeak directly with Screen Moove about your display, digital signage, meeting-room or AV project.
Speak directly with a dedicated Screen Moove expert and get the right solution first time.
Simply complete our contact form, and we will promptly respond to your inquiries.
If you have any questions or enquiry, please fill out the form below with all of your details and we'll get back to you shortly.
Contact our team of experts today!